Tunnel _C_, being higher, was more in soft ground, and at first it was the intention to delay its excavation until it had been well drained by the bottom headings in the tunnels on each side. A little later it was decided to use a shield without compressed air. This shield had been used in excavating the stations of the Great Northern and City Tunnel in London. It was rebuilt, its diameter being changed from 24 ft. 8-1/2 in. to 23 ft. 5-1/4 in. It proved too weak, and after it had flattened about 4 in. and had been jacked up three times, the scheme was abandoned, the shield was removed, and work was continued by the methods which were being used in the other tunnels. The shield was rather light, but probably it would have been strong enough had it been used with compressed air, or had the material passed through been all earth. Here, there was a narrow concrete cradle in the bottom, with rock up to about the middle of the tunnel, which was excavated to clear the shield, and gave no support on its sides. The shield was a cylinder crushed between forces applied along the top and bottom. With the exception of this trial of a shield in Tunnel _C_, and a novel method in Tunnel _B_, where compressed air, but no shield, was used, the description of the work in one tunnel will do for all. From the bottom headings break-ups were started at several places in each tunnel where there was ample cover of rock above. Where the roof was in soft ground, top headings were driven from the points of break-up and timbered. As soon as the full-sized excavation was completed, the iron lining was built, usually in short lengths. It will be noticed on Plate XIII that there is a depression in the rock between Station 65 and the river shafts, leaving all the tunnels in soft ground. As this was directly under the Long Island Railroad passenger station, it was thought best to use a shield and compressed air. This was done in Tunnels _A_, _C_, and _D_, one shield being used successively for all three. It was first erected in Tunnel _D_ at Station 64 + 47. From there it was driven westward to the river shaft. It was then taken apart and re-erected in Tunnel _C_ at Station 63 + 63 and driven westward to the shaft. It was then found that there would not be time for one shield to do all four lines. The experience in Tunnels _C_ and _D_ had proven the ground to be much better than had been expected. There was considerable clay in the sand, and, with
PREV.   NEXT  
|<   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27  
28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   >>   >|  



Top keywords:

shield

 

Tunnel

 
compressed
 

bottom

 

ground

 

driven

 

Station

 

tunnel

 

tunnels

 
headings

erected
 

westward

 

Tunnels

 
excavation
 
lengths
 

noticed

 

places

 
points
 

timbered

 
completed

lining

 
experience
 
proven
 

considerable

 

expected

 

leaving

 
directly
 

shafts

 

depression

 
Island

started
 

successively

 

thought

 

station

 

Railroad

 

passenger

 

cradle

 

rebuilt

 

diameter

 
changed

proved
 
scheme
 

abandoned

 

jacked

 

flattened

 
London
 

drained

 

intention

 

higher

 

stations