FREE BOOKS

Author's List




PREV.   NEXT  
|<   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31  
32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   >>   >|  
[Illustration: PLATE LXIV, FIG. 1.--TUNNELING IN COMPRESSED AIR WITHOUT SHIELD.] [Illustration: PLATE LXIV, FIG. 2.--T-HEAD AIR-LOCK.] [Illustration: PLATE LXIV, FIG. 3.--CUTTING EDGE OF CAISSON ASSEMBLED.] [Illustration: PLATE LXIV, FIG. 4.--CAISSON SUPPORTED ON JACKS AND BLOCKS.] CONCRETE CRADLES, HAND-PACKED STONE AND GROUTING. Had the East Avenue Tunnel been built by shields, as was contemplated at the time of its design, the space between the limits of excavation and the iron lining would have been somewhat less than by the method actually used, especially in the earth portions. This space would have been filled with grout ejected through the iron lining. The change in the method of doing the work permitted the use of cheaper material, in place of part of the grout, and, at the same time, facilitated the work. The tube of cast-iron rings is adapted to be built in the tail of the shield. Where no shield was used, after the excavation was completed and all loose rock was removed, timbers were fixed across the tunnel from which semicircular ribs were hung, below which lagging was placed. The space between this and the rough rock surface was filled with concrete. This formed a cradle in which the iron tube could be erected, and, at the same time, occupied space which would have been filled by grout, at greater cost, had a shield been used. As soon as each ring of iron was erected, the space between it and the roof of the excavation was filled with hand-packed stone. At about every sixth ring a wall of stone laid in mortar was built between the lining and the rock to serve as a dam to retain grout. The interstices between the hand-packed stones were then filled with 1 to 1 grout of cement and sand, ejected through the iron lining. The concrete cradles averaged 1.05 cu. yd. per ft. of tunnel, and cost, exclusive of materials, $6.70 per cu. yd., of which $2.25 was for labor and $4.45 was for top charges. The hand-packed stone averaged 1-1/2 cu. yd. per ft. of tunnel, and cost $2.42 per cu. yd., of which $0.98 was for labor and $1.44 was for top charges. ERECTION OF IRON LINING. The contractors planned to erect the iron lining with erectors of the same pattern as that used on the shield under the river, mounted on a traveling stage. These will be described in detail in Mr. Japp's paper. Two of these stages and erectors worked in each tunnel at different points. The tunnel was attacked from so many p
PREV.   NEXT  
|<   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31  
32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   >>   >|  



Top keywords:
filled
 

lining

 

tunnel

 

Illustration

 

shield

 

excavation

 

packed

 
CAISSON
 

ejected

 
concrete

charges

 

erectors

 

averaged

 

erected

 

method

 
materials
 

exclusive

 
limits
 

COMPRESSED

 

design


TUNNELING

 
Avenue
 

cradles

 

mortar

 

cement

 

stones

 

retain

 
interstices
 

detail

 

stages


attacked
 

points

 
worked
 

planned

 

Tunnel

 

contractors

 

LINING

 

ERECTION

 

pattern

 

traveling


mounted

 

contemplated

 

WITHOUT

 
SHIELD
 
adapted
 

ASSEMBLED

 
facilitated
 

completed

 

CRADLES

 

CONCRETE