the foot of West 32d Street. On May 11th, 1906, the work of excavation was commenced on the east side of Ninth Avenue, and on July 9th, 1906, on the south side of 31st Street, between Ninth and Tenth Avenues. From the beginning, the excavation was carried on by day and night shifts, except on Sundays and holidays, until January, 1909, except that during the period from November, 1907, to October, 1908, the night shift was discontinued. _Geology._--The rock encountered may be classed as "gneiss"; its character varied from granite to mica schist. It was made up of quartz, feldspar, and mica, and there were also some isolated specimens of pyrites, hornblend, tourmaline, and serpentine. On the south side of the work, just west of Ninth Avenue, there were excellent examples of "contortions" of veins of quartz in the darker rock. On the east side of Ninth Avenue, near the north end of the work, glacial marks were found on the rock surface. The general direction of the stratification was north 5 deg. west, and the general incline about 60 deg. with the horizontal. As a rule, the rock broke sharply along the line of stratification. On the south side it broke better than on the north side, where it was usually softer and more likely to slide; and this, together with the fact that in winter it was subject to alternate freezing and thawing and in summer to the direct rays of the sun, made it rather difficult to get a good foundation for the retaining walls. WORK IN AND UNDER NINTH AVENUE. _General Description._--The work involved the excavation of about 375 ft. of the full width of Ninth Avenue to an average depth of about 58 ft., and the construction over this area of a steel viaduct, the deck of which was about 24 ft. below the surface, for the ultimate support of the Ninth Avenue structures. The following estimated quantities appear in the contract: Excavation of rock, 72,600 cu. yd.; excavation of all materials except rock, 9,300 cu. yd.; concrete (1:3:6) in abutments, etc., 1,680 cu. yd.; timber, 504,000 ft., B.M.; structural steel, 1,320,000 lb., etc. While this excavation was being done it was necessary to support and maintain the three-track elevated railway structure of the Interborough Rapid Transit Company, of which 18 columns, or a length of about 340 ft., were affected, the two-track surface railway structure of the New York City Railway Company, and various pipes, sewers, and conduits, and to maintain a
PREV.   NEXT  
|<   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27  
28   29   30   31   32   33   34   35   36   37   38   >>  



Top keywords:

Avenue

 
excavation
 
surface
 

maintain

 
stratification
 
quartz
 
railway
 

structure

 

support

 

Street


Company
 
general
 

conduits

 
structures
 
ultimate
 

viaduct

 
average
 

AVENUE

 

foundation

 

retaining


General

 

Description

 

estimated

 

construction

 

involved

 

elevated

 

Interborough

 
Railway
 
Transit
 

affected


length

 

columns

 
structural
 

materials

 

sewers

 

contract

 

Excavation

 

concrete

 

timber

 
abutments

difficult

 

quantities

 

classed

 

gneiss

 
encountered
 

discontinued

 

Geology

 

character

 

isolated

 

specimens