ts would come, to prevent the subsidence of the track owing to the sag in the I-beams. As much excavation, to a depth of about 20 ft., was taken out adjoining the elevated railway foundations as could be done with safety. Fig. 2, Plate XLVII, shows this condition of the work. The 48-in. brick sewer was broken, and the sewage was pumped across the excavation. The overhead girders "B" were then put in place, and two of the girders "C" were used as temporary shoring girders at each column. These, as shown by Fig. 3, Plate XLVII, were placed parallel to the elevated railway, with blocking between them and the girders "B." Double bents, independent of each other, were placed under the ends of these temporary shoring girders, and these were braced securely to prevent possible dislodgment during the removal of the rock. The weight of the structure was then taken by jacking up the girders near the bents until the column was lifted off the old foundation; blocking was put in between the girders and the bents during the jacking, so that when the jacks were released the base of the column was still clear of the old foundation. One 80-ton jack was used for this purpose, and the general method is shown by Fig. 1, Plate LII. [Illustration: FIG. 4. (Full page image) METHOD OF EXCAVATING NINTH AVENUE PLAN AND ELEVATION SHOWING VARIOUS STAGES OF THE WORK] [Illustration: FIG. 5. (Full page image) METHOD OF EXCAVATING NINTH AVENUE SECTIONS SHOWING VARIOUS STAGES OF WORK No. 1 Condition Prior to Commencement of Work No. 2 East side of Avenue cut down about 20 ft. Beams with Supporting Posts placed under Surface Railway Tracks. Girders _B_ and Temporary Shoring Girders _C_ for supporting Elevated Ry. in place. No. 3 I's in place under Surface Ry. Tracks. Elevated Ry. carried on Temporary Shoring Girders, and Girders _C_ in place. 24" Water Main carried on Timber Cradle and sewage carried through Pipe _R_. Foot Walk carried on Girders _C_ in place on West Side of Avenue. No. 4 Elevated Railway carried on Bents under Columns. Temporary Shoring Girders removed and Permanent Bents resting on Girders _C_ in place. Bents in place on Girders _C_ carrying Surface Railway. East and West sides of Avenue excavated down to Sub-Grade and Five rows of Permanent Steel in place on each side. Bents erected on Permanent Steel to catch ends of Girders _C_ while 2 outside Concrete Piers are removed and 6th row of Permanent Steel o
PREV.   NEXT  
|<   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32  
33   34   35   36   37   38   >>  



Top keywords:

Girders

 
girders
 
carried
 

Permanent

 
Elevated
 
Shoring
 
column
 

Temporary

 

Railway

 

Surface


Avenue
 
foundation
 

blocking

 
jacking
 
EXCAVATING
 

STAGES

 
VARIOUS
 

removed

 

Tracks

 

SHOWING


AVENUE

 

Illustration

 

METHOD

 

elevated

 

sewage

 

prevent

 

excavation

 
railway
 
shoring
 

temporary


Cradle

 

supporting

 
Timber
 

Double

 

Commencement

 

Supporting

 

parallel

 

erected

 

Concrete

 
subsidence

Columns

 

excavated

 

carrying

 

resting

 
released
 

lifted

 

removal

 

dislodgment

 

braced

 

securely