k below sub-grade as well as that on the Terminal Station-West. Four straight-line compressors and one cross-compound Corliss compressor were installed, the steam being supplied by three Stirling boilers. Three electrically-driven air compressors, using current at 6,600 volts, were also installed, and the total capacity of the power-house was about 19,000 cu. ft. of free air per minute compressed to 90 lb. per sq. in. _Disposal Pier._--The disposal pier (old No. 62 and new No. 72), at the foot of West 32d Street, North River, was leased by the Pennsylvania Railroad Company. The entire pier, with the exception of the piles, was taken down, and the piles which would be in the path of the proposed tunnel were withdrawn prior to the building of the tunnels and the construction of the pier for disposal purposes. Subsequent to the driving of the tunnels there was a considerable settlement in the pier, especially noticeable at the telphers, and finally these had to be abandoned on this account. Fig. 3, Plate LI, shows the chutes through which the earth was dumped on the decks of the scows to form a padding on which to dump the heavier rock. Fig. 4, Plate LI, shows the derricks at the end of the pier. These were used, not only for loading heavy stones and skips, but also with a clam-shell bucket for bringing in broken stone and sand for use in the work. Large quantities of pipe, conduits, brick, etc., were also brought to this pier for use on the work. [Illustration: FIG. 9. (Full page image) PORTAL, RETAINING AND FACE WALLS, TENTH AVENUE] ORGANIZATION OF ENGINEERING FORCE IN FIELD. The design and execution of the work were under the direction of Charles M. Jacobs, M. Am. Soc. C.E., Chief Engineer, and James Forgie, M. Am. Soc. C.E., Chief Assistant Engineer. The writer acted as Resident Engineer. [Illustration: Fig. 10.] The general organization of the engineering force in the field is shown by the diagram, Fig. 10. The position of Assistant Engineer, in responsible charge of Construction and Records, has been filled in turn by Messrs. A.W. Gill, N.C. McNeil, Jun. Am. Soc. C.E., and W.S. Greene, Assoc. M. Am. Soc. C.E. Messrs. A.P. Combes and T.B. Brogan have acted as Chief Inspector and Night Inspector, respectively, in charge of outside work during the entire carrying out of the contract. Base lines had been established on Ninth and Tenth Avenues for the Terminal work east of Ninth Avenue and for the Tu
PREV.   NEXT  
|<   28   29   30   31   32   33   34   35   36   37   38   >>  



Top keywords:

Engineer

 
charge
 
entire
 

Assistant

 
tunnels
 
disposal
 
Messrs
 

installed

 

Terminal

 

compressors


Inspector
 
Illustration
 

bucket

 
direction
 
design
 

quantities

 
conduits
 

broken

 

bringing

 

execution


RETAINING

 

Charles

 

AVENUE

 

brought

 

PORTAL

 

ENGINEERING

 

ORGANIZATION

 
engineering
 
Brogan
 

Greene


Combes

 

carrying

 
Avenues
 

Avenue

 

established

 

contract

 

organization

 

general

 

Forgie

 
writer

Resident

 

diagram

 

McNeil

 

filled

 
position
 

responsible

 

Construction

 

Records

 

Jacobs

 

capacity