driven by air supplied to the original engine. One Robbins belt conveyor, driven by a 30-h.p. engine run by air. Three 1-cu. yd. Hopple dump-cars. CONSTRUCTION. Ground was broken for work under the principal contract on July 9th, 1904, on which date the contractor began cutting asphalt for Trench No. 1 in 31st Street, and also began making a roadway from Ninth Avenue into the pit just south of 32d Street. _Excavation for Retaining Walls._--Two essentially different methods were used in excavating for and building the retaining walls; one, construction in trench, the other, construction on bench. In general, the trench method was used wherever the rock on which the wall was to be founded was 12 ft. or more below the surface of the street; or, what is perhaps a more exact statement, as it includes the determining factor, where the buildings adjoining the wall location were not founded on rock. In the trench method the base of the wall was staked out on the surface of the ground, the required width being determined by the elevation of the rock, as shown by the borings. The contractor then added as much width as he desired for sheeting and working space, and excavated to a depth of about 5 ft. before setting any timber. In some cases the depth of 5 ft. was excavated before the cableway or derrick for the excavation was erected, the wagons being driven directly into the excavation and loaded by hand, but, usually, the cableway was first erected, and buckets were used from the start. After the first 5 ft. had been excavated, two sets of rangers and struts were set, the first in the bottom of the excavation and the second at the level of the street surface, supported by posts resting on the bottom rangers. The sheeting was then set, and all voids back of it were filled with clean earth and well tamped. The toe of the sheeting was kept level with the bottom of the excavation until the ground-water was reached, after which it was kept from 3 to 5 ft. ahead of the digging. The sheeting used was 3-in., in variable widths; it was always tongued and grooved on the side of the trench next to the buildings and in the deeper excavations on both sides of the trench, and was driven by wooden mauls above the ground-water level, but steam sheeting-drivers were used below that elevation. Struts, rangers, and posts were generally 12 by 12-in. Some exceedingly bad material was encountered in the deeper excavations,
PREV.   NEXT  
|<   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46  
47   48   49   50   51   52   53   54   55   56   57   58   59   >>  



Top keywords:

trench

 

sheeting

 

excavation

 

driven

 
surface
 

ground

 

excavated

 

bottom

 

rangers

 

Street


founded

 

construction

 

street

 
contractor
 
deeper
 
excavations
 

elevation

 

cableway

 

buildings

 

method


engine

 

erected

 

setting

 
timber
 

directly

 

loaded

 
wagons
 
buckets
 

derrick

 
resting

wooden
 

widths

 
tongued
 

grooved

 
exceedingly
 

material

 

encountered

 
generally
 

drivers

 

Struts


variable

 
digging
 

supported

 

working

 
struts
 

filled

 

reached

 

tamped

 
factor
 

cutting