FREE BOOKS

Author's List




PREV.   NEXT  
|<   50   51   52   53   54   55   56   57   58   59   >>  
G BAYS] These boats had all been designed for lighter work than they were here required to perform, and a large amount of breakage occurred from the start. In order that the contractors for the excavation should be unhampered as to method of loading, the contracts provided that they should pay for all damage done to the scows in loading, other than ordinary and usual wear and tear, all other damage being at the expense of the contractor for the disposal. A rigid system of inspection was necessary to determine and record properly the damage for which each contractor was responsible; and, as much of the breakage could not be noticed from the exterior, a thorough examination of the interior of each scow was made before and after every loading. In order to keep proper records, the bays of each scow, formed by the cross-trusses, were numbered, beginning aft with number 1 and going forward to the bow, and the longitudinal bays formed by the main beams were lettered, beginning with "_A_" on the port side. A beam broken in "1-_A_," therefore, would be an intermediate beam in the stern port corner bay, and a beam broken in "10-_A-B_" would be a main beam at the bow end on the port side. The underside of each plank was marked with a number beginning with 1 at the stern and increasing by unity to the bow. Fig. 11 is a diagram of a scow in accordance with this system. In addition to recording the date, location, extent, and party responsible for each damage, in a book kept for that purpose, the injured member was marked with paint, the color of which indicated the party responsible. The repairs were made by the contractor for the disposal of material, and the cost was assessed according to the marking in the boat. The careful inspection of the damage done to scows and the cost of their repairs enables a fairly accurate statement to be made of the amount at different points, and it is here given on the basis of cost of repairs per cubic yard, barge measurement, of material handled. Cost, in cents per cubic yard. Repairs of damage done in loading material from the terminal site 2.00 Repairs of damage done in loading material from cross-town tunnels 1.32 Repairs of damage done in loading material from under-river tunnels 1.77 Repairs of damage done in transp
PREV.   NEXT  
|<   50   51   52   53   54   55   56   57   58   59   >>  



Top keywords:
damage
 

loading

 

material

 

Repairs

 
contractor
 

beginning

 
repairs
 

responsible

 
disposal
 
formed

inspection

 

number

 

system

 

amount

 

broken

 
marked
 
tunnels
 

breakage

 

increasing

 
addition

recording

 

extent

 

accordance

 

diagram

 

location

 

fairly

 

terminal

 

handled

 
measurement
 
transp

points

 
assessed
 

injured

 

member

 

marking

 

accurate

 

statement

 
underside
 

enables

 
careful

purpose

 

numbered

 

ordinary

 
provided
 
contracts
 

unhampered

 

method

 

determine

 

expense

 

excavation