ermination of the suitable profile or cross section is concerned, as that has been very exhaustively investigated, and fairly agreed upon, from a mathematical point of view, but to be principally due to the correctness of the estimate of the floods to be dealt with, and a sufficient provision of by-wash allowed for the most extreme cases; and, lastly, perhaps the most important of all, the securing a thoroughly good foundation, and a careful execution of the work throughout. These remarks equally apply to earthwork dams, as regards sufficient provision of by-wash, careful execution of work, and security of foundation, but their area of cross section, supposing them to be water-tight, on account of the flatness of their slopes and consequent breadth of base, is, of course, far in excess of that merely required for stability; but in these latter, the method adopted for the water supply discharge is of the very greatest importance, and will be again referred to. Before commencing the excavation for the foundations of a dam, it is most essential that the character of the soil or rock should be examined carefully, by sinking a succession of small shafts, not mere borings, along the site, so that the depth to which the trench will have to be carried, and the amount of ground water likely to be encountered, can be reliably ascertained, as this portion of the work cannot be otherwise estimated, and as it may bear a very large proportion of the total expense of construction, and in certain cases may demonstrate that the site is altogether unsuitable for the proposed purpose. The depth to which puddle trenches have been carried, for the purpose of penetrating water-bearing strata, and reaching impenetrable ground, in some cases, has been as much as 160 ft. below the natural surface of the ground, and the expense of timbering, pumping, and excavation in such an instance can be easily imagined. This may be realized by referring to Fig. 4, giving a cross-section of the Yarrow dam, in which the bottom of the trench is there only 85 ft. below the ground surface. In the Dale Dyke dam, Fig. 2, the bottom of the trench was about 50 ft. below the ground surface. There is one other point which should be mentioned in connection with the form of the base of the puddle trench--that instead of cutting the bottom of the trench at the sides of the valley in steps, it should be merely sloped, so that the puddle, in setting, tends to slide
PREV.   NEXT  
|<   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37  
38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   61   62   >>   >|  



Top keywords:

ground

 

trench

 

bottom

 

surface

 

puddle

 

section

 
careful
 

foundation

 

expense

 

excavation


purpose
 

execution

 

provision

 

carried

 

sufficient

 

trenches

 

penetrating

 

ascertained

 
reaching
 

impenetrable


strata

 
reliably
 

bearing

 

unsuitable

 

estimated

 
portion
 

proportion

 
altogether
 

demonstrate

 

construction


proposed

 

pumping

 

mentioned

 

connection

 

sloped

 

setting

 

valley

 
cutting
 

instance

 

easily


imagined
 
encountered
 

natural

 
suitable
 
timbering
 
realized
 

ermination

 

Yarrow

 

referring

 

giving