FREE BOOKS

Author's List




PREV.   NEXT  
|<   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41  
42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   >>   >|  
to enter a little more fully into the details of its construction. It was situated at Bradfield, six or seven miles from Sheffield, and at several hundred feet higher level. Its construction was commenced in 1858, the puddle trench was probably taken down to a depth of 40 ft. to 50 ft., a considerable amount of water being encountered. This trench was 15 ft. to 20 ft. broad at the top, and of course had to be crossed by the before mentioned line of pipes; and although the trench was filled with puddle, and the gullet cut in the rock already mentioned for carrying the pipes under the site of the dam was "padded" with a layer of 12 in. of puddle, we can imagine that the effect of the weight of the puddle wall and bank upon this line of pipes would be very different at the point where they crossed the puddle trench to what it would be where they were laid in the rock gullet and partially protected from pressure by the sides of the latter. At the trench crossing there would be a bed of puddle 50 ft. in thickness beneath the pipe, in the gullet a bed of 1 ft. in thickness. So much as regards the laying of the pipes. The embankment had scarcely been completed when, on March 11, 1864, a storm of rain came on and nearly filled it up to the by-wash, when the bank began slowly to subside. The engineer was on the crest at the very time, and remained until the water was running over his boots; he then rushed down the other slope and was snatched out of the way as the bank burst, and the whole body of water, about 250,000,000 gallons, rushed out through the trench, carrying with it in the course of about twenty minutes 92,000 cubic yards, or say one fourth of the total mass of earthwork, causing the death of 250 human beings, not to mention cattle, and destruction of factories, dwellings, and bridges, denuding the rock of its surface soil, and, as it were, obliterating all the landmarks in its course. The greatest depth of the bank from ground level to crest was 95 ft., the top width 12 ft., and the slopes, both on the up stream and down stream sides, 21/2 to 1, and the area of the reservoir 78 acres. Mr.--now Sir Robert--Rawlinson, together with Mr. Beadmore, were called in to make a report, to lay before Parliament, upon this disaster; and having made a careful examination of the ruins, and taken evidence, they were of opinion that the mode of laying the pipes, and in such an unprotected way, was faulty, and that subsidence of t
PREV.   NEXT  
|<   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41  
42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   >>   >|  



Top keywords:

trench

 

puddle

 

gullet

 

stream

 

construction

 

carrying

 

mentioned

 

filled

 

rushed

 

thickness


laying

 

crossed

 

fourth

 

mention

 

earthwork

 

beings

 

causing

 

opinion

 
twenty
 

subsidence


faulty

 
snatched
 

cattle

 

minutes

 

gallons

 

unprotected

 

evidence

 

Parliament

 

reservoir

 
slopes

disaster
 

Beadmore

 

called

 

report

 
Rawlinson
 
Robert
 
surface
 

obliterating

 
denuding
 

bridges


factories

 

dwellings

 

landmarks

 

careful

 

examination

 

greatest

 

ground

 

destruction

 

padded

 

Bradfield