FREE BOOKS

Author's List




PREV.   NEXT  
|<   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29  
30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   >>   >|  
shaft, which passes down the center of the post, and by means of a cross shaft is geared to the front axle, from which four of the ground wheels are driven. The post is octagonal, built up of plates 3/4 in. thick; at the bottom end it is secured to the girders of the truck, and at the top is shrunk on to a large gudgeon 12 in. in diameter, which enters a casting fixed in the back end of the jib; on the top of the gudgeon are two steel disks on which an adjustable cap rests; by means of this and the ties to the tail and the lower end of the strut a proportion of the weight can be brought on to the post so as to relieve the roller path to any desired extent, and enable the crane to be revolved easily. The truck is 24 ft. long and 16 ft. 41/2 in. wide; it is constructed of longitudinal and transverse box girders 2 ft. 8 in. deep, and rests on two axles 6 in. in diameter; round these axles swivel the cast-iron bogie frames which carry the ground wheels. This arrangement was adopted because the crane has to travel up a gradient of 1 in 30, and the bogies enable it to take the incline better; they also distribute the weight more evenly on the wheels. The gauge of the rails is 15 ft, the wheels are 2 ft. 6 in. in diameter, and have heavy steel tires. The weight on each of the front wheels when running with the ballast, but no load, is about 16 tons. A powerful brake is applied to the wheels when descending the incline. All the clutch levers, break treadle, and handles are brought together, so that one man has the crane under his entire control. An iron house, of which the framing only is shown, extends from the gearing right back to the boiler, forming a most spacious engine room and stokehole. A separate donkey engine is provided for feeding the boiler. The truck is furnished with legs under which packings can be wedged so as to relieve the load on the wheels when block-setting. The slings seen under the boiler are for hanging a concrete balance weight; this will weigh about 20 tons. The weight of the crane itself without load or ballast is about 80 tons. The crane was tested under steam with a load of 19 tons with the most satisfactory results; the whole machine appeared to be very rigid, an end often very difficult to obtain with portable wrought-iron structures and live loads. The result in the present case is probably greatly due to the careful workmanship, and to the fact that the sides and ends of the plates are
PREV.   NEXT  
|<   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29  
30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   >>   >|  



Top keywords:

wheels

 

weight

 

boiler

 

diameter

 

enable

 

relieve

 
incline
 

brought

 

engine

 

girders


plates
 

gudgeon

 

ballast

 

ground

 

gearing

 

workmanship

 

extends

 

donkey

 
stokehole
 

forming


spacious

 
separate
 

levers

 

treadle

 

clutch

 
descending
 

handles

 
framing
 

control

 

entire


provided

 

machine

 

appeared

 

results

 

satisfactory

 

tested

 

difficult

 
present
 

structures

 

wrought


obtain
 
portable
 

greatly

 
setting
 
slings
 
careful
 

result

 

wedged

 

furnished

 

packings