FREE BOOKS

Author's List




PREV.   NEXT  
|<   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97  
98   99   100   101   102   103   104   105   106   107   108   109   110   111   112   113   114   >>  
: FIG. 70.--"Banjo."] PIPING.--From the service pipe on which there has been placed a shut-off, a line of piping, full size, is run through the basement, overhead to a convenient place, perhaps to a partition in the center of the cellar. The pipe is brought down and connected into the end of a header. This header or banjo is made of Ts placed 4 inches center to center. From each T a line of pipe is run to each isolated fixture or set of fixtures (see Fig. 70). A stop and waste cock is placed on each line at such a point that all stop cocks will come in a row near the header. A small pipe is run from the waste of each stop and discharged into a larger pipe which connects with a sink. This way of running pipes while it is expensive makes a very neat and good job. Each stop cock has a tag on it stating explicitly what it controls. If the building is a large one a number of these panelled headers are used. A less expensive way to run this pipe is to branch off from the main at points where the branch pipe will be as short as possible and use as few fittings as possible. Stop and waste cocks are then placed on each branch near the main. All pipe must follow the direct line of fitting with which it is connected. The line of pipe should be perfectly straight. If it seems necessary to bend the pipe to get around an obstacle, then good judgment has not been used in placing the fitting into which the pipe is screwed. The fitting should be re-located so that the pipe can be run without bending. To have true alignment of pipes the whole job or section of the job must be drawn out on paper first and any obstacles noted and avoided before the piping is cut. This not only saves time but it is also the forerunner of a good job. When getting measurements for piping the same rule or tape should be used to get out the pipe as was used to get the measurements. The water main and branches that run through the basement of a building are generally hung on the ceiling. Rough hangers of wood, rope, or wire are usually used to hold the pipe in place at first, then neat and strong adjustable hangers are placed every 8 feet apart. There are in use too many kinds of hangers to explain or describe them here. The essential point of all good hangers is to have them strong, neat, and so made that perfect alignment of the pipe can be had. The hangers should be so placed that no strain will come on the fitting or the valves. A hanger should be pl
PREV.   NEXT  
|<   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97  
98   99   100   101   102   103   104   105   106   107   108   109   110   111   112   113   114   >>  



Top keywords:

hangers

 

fitting

 
header
 

branch

 

piping

 

center

 

alignment

 

measurements

 

building

 
expensive

basement
 

strong

 

connected

 
essential
 
explain
 

avoided

 

obstacles

 
describe
 

section

 
valves

bending

 
hanger
 
located
 

strain

 

perfect

 

branches

 
generally
 

adjustable

 

screwed

 
ceiling

forerunner
 

headers

 

fixture

 

fixtures

 

isolated

 

inches

 

larger

 

connects

 

discharged

 
service

PIPING
 
overhead
 

brought

 

cellar

 

partition

 
convenient
 

running

 

follow

 

direct

 

fittings