PROGRESS OF EXCAVATION. Owing to the numerous sections of poor rock, interspersed throughout the work with stretches of sound rock, the progress of the excavation was very irregular, especially in 32d Street. The rate of excavation in good ground is shown in Table 1. In the sections of bad ground, the operations of excavation, timbering, and lining were often carried on alternately, and it is impracticable to include them in the table. TABLE 1.--PROGRESS AND METHODS OF EXCAVATION IN GOOD GROUND. THIRTY-THIRD STREET. ============================================================ 1 | 2 | 3 | -----------------------------+--------+--------------------+ | | | | | | Type of excavation. |Tunnels.| Worked from: | | | | | | | -----------------------------+--------+--------------------+ Full-sized single tunnel | B | 1st Ave. shaft. | | | | Full-sized single tunnel | A | 1st Ave. shaft. | | | | Full-sized twin tunnel |A and B | 1st Ave. shaft. | | | | | | | | | | Full-sized twin tunnel |A and B |Intermediate shaft. | | | (West of shaft.) | | | | | | | Full-sized twin tunnel |A and B |Intermediate shaft. | | | (East of shaft.) | | | | | | | Full-sized twin tunnel |A and B |Intermediate shaft. | | | (East of shaft.) | | | | | | | Exploration drift |A and B |Intermediate shaft. | | | (West of shaft.) | |
PREV.   NEXT  
|<   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   >>  



Top keywords:
tunnel
 

excavation

 

Intermediate

 

single

 

ground


EXCAVATION

 
sections
 
PROGRESS
 

THIRTY

 
GROUND

METHODS

 

include

 
Exploration
 

Worked

 

Tunnels


STREET

 

progress

 

irregular

 
Street
 
stretches

numerous

 

interspersed

 
lining
 
carried
 

alternately


timbering

 

operations

 
impracticable