FREE BOOKS

Author's List




PREV.   NEXT  
|<   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35  
36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   >>   >|  
t ten thousand pounds to the square inch. As the weight of the iron is known, and its tensile strength is estimated at sixty thousand pounds per square inch, this estimate, which is technically called "a factor of safety" of six, is a very safe one. In other words, the bridge is planned and so constructed that in supporting its own weight, together with any load of locomotives or cars which can be placed upon it, it shall not be subjected to a strain over one-sixth of its estimated strength. [Illustration: NEW RIVER BRIDGE ON ITS STAGING.] After the plan is made, working drawings are prepared and the process of manufacture commences. The eye-bars, when made, are tested in a testing-machine at double the strain which by any possibility they can be put to in the bridge itself. The elasticity of the iron is such that after being submitted to a tension of about thirty thousand pounds to the square inch it will return to its original dimensions; while it is so tough that the bars, as large as two inches in diameter, can be bent double, when cold, without showing any signs of fracture. Having stood these tests, the parts of the bridge are considered fit to be used. [Illustration: BRIDGE AT ALBANY.] When completed the parts are put together--or "assembled," as the technical phrase is--in order to see that they are right in length, etc. Then they are marked with letters or numbers, according to the working plan, and shipped to the spot where the bridge is to be permanently erected. Before the erection can be begun, however, a staging or scaffolding of wood, strong enough to support the iron structure until it is finished, has to be raised on the spot. When the bridge is a large one this staging is of necessity an important and costly structure. An illustration on another page shows the staging erected for the support of the New River bridge in West Virginia, on the line of the Chesapeake and Ohio Railway, near a romantic spot known as Hawksnest. About two hundred yards below this bridge is a waterfall, and while the staging was still in use for its construction, the river, which is very treacherous, suddenly rose about twenty feet in a few hours, and became a roaring torrent. [Illustration: LA SALLE BRIDGE.] The method of making all the parts of a bridge to fit exactly, and securing the ties by pins, is peculiarly American. The plan still followed in Europe is that of using rivets, which makes the erection of a bri
PREV.   NEXT  
|<   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35  
36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   >>   >|  



Top keywords:
bridge
 

staging

 

BRIDGE

 
square
 

pounds

 

thousand

 
Illustration
 

working

 

strain

 
erected

erection

 

structure

 

double

 
support
 
strength
 

weight

 

estimated

 

illustration

 
important
 

costly


numbers

 

Chesapeake

 

Virginia

 

necessity

 

tensile

 

scaffolding

 

permanently

 

strong

 

finished

 

raised


Railway

 

shipped

 
Before
 

Hawksnest

 

making

 
securing
 

method

 

roaring

 

torrent

 

rivets


Europe

 

peculiarly

 
American
 

waterfall

 

hundred

 
romantic
 

letters

 
twenty
 
suddenly
 
construction