FREE BOOKS

Author's List




PREV.   NEXT  
|<   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59  
60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   >>   >|  
son. The dry way, too, in which he suggests that conclusions based upon actual results from existing railways are of more value than deductions from supposed conditions upon imaginary roads, is exceedingly entertaining. The result was the adoption of the gauge recommended by him, namely, five feet. Those who remember the "Battle of the Gauges," and who know how much expense and trouble the wide gauge has since caused, will appreciate the stand taken thus early by Major Whistler; and this was but one among many cases which might be mentioned to show how comprehensive and far-reaching was his mind. The roadbed of the St. Petersburg and Moscow Railway was made 30 feet wide on top, for a double track of 5 foot gauge, with a gravel ballasting two feet deep. The bridges were of wood, of the Howe pattern, no spans being over 200 feet in length. The stations at each end, and the station and engine houses along the line, were on a plan uniform throughout, and of the most ample accommodation. Fuel and water stations were placed at suitable points, and engine houses were provided 50 miles apart, built of the most substantial masonry, circular in form, 180 feet in diameter, surmounted by a dome, and having stalls for 22 engines each. Repair shops were attached to every engine house, furnished with every tool or implement that the wants of the road could suggest. The equipment of rolling stock and fixed machinery for the shops was furnished by the American firm of Winans, Harrison & Eastwick, who from previous acquaintance were known by Major Whistler to be skillful, energetic, and reliable. Much diplomacy was needed to procure the large money advances for this part of the work, the whole Winans contract amounting to nearly five millions of dollars; but the assurance of Major Whistler was a sufficient guarantee against disappointment or failure. In 1843 the plans for the work were all complete, and in 1844 the various operations along the line were well under way, and proceeding according to the well arranged programme. In 1845 the work had progressed so far that the construction of the rolling stock was commenced. The locomotives were of two classes, freight and passenger. The engines of each class were made throughout from the same patterns, so that any part of one engine would fit the same position on any other. The passenger engines had two pairs of driving wheels, coupled, 6 feet in diameter, and a four wheeled truck simila
PREV.   NEXT  
|<   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59  
60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   >>   >|  



Top keywords:

engine

 

engines

 

Whistler

 

Winans

 

passenger

 
rolling
 

diameter

 

furnished

 

stations

 

houses


energetic
 

reliable

 

skillful

 

dollars

 

acquaintance

 

millions

 

amounting

 
diplomacy
 

advances

 

conclusions


needed

 

procure

 

previous

 

contract

 

Harrison

 

existing

 
implement
 
railways
 

Repair

 
attached

machinery

 

American

 

assurance

 
actual
 

suggest

 

equipment

 

results

 

Eastwick

 
patterns
 

commenced


locomotives

 

classes

 

freight

 

position

 

wheeled

 

simila

 
coupled
 
driving
 

wheels

 

construction