were not removed until just before the bench concrete was placed. This was important, as otherwise the bond between the old and new concrete would be much impaired by dirt ground into the surface of the old concrete. The ducts were then laid, as shown in Fig. 2, Plate LXXIV. The remaining shutters for the face of the bench walls were then placed. The remainder of the forms for the refuge niches, _RR_, in Fig. 1, Plate LXXIV, were nailed to the shutters, the steel beam over the niche was laid in place, the forms for the ladders, _L_ in Fig. 2, Plate LXXIV, which occur every 25 ft., were tacked to the shutters, the shutters and forms were given a coat of creosote oil, and then all was ready for placing the bench concrete. The specifications required a 2-in. mortar face to be placed on all exposed surfaces and the remainder to be smoothed with a trowel and straight-edge. After about 48 hours, the biats were blocked up on the bench, and all forms between the bench walls below the working floor were removed. The centering for the arch concrete consisted of simple 5 by 3-1/2 by 5/16-in. steel-angle arch ribs, curved to the proper radius, spaced at 5-ft. intervals. Each rib was made up of two pieces spliced together at the top. Two men easily handled one of these pieces. After splicing, the rib was supported by four hanger-bolts fastened to the iron lining as shown in Fig. 3, Plate LXXIV. In the early part of the work, two additional bolts were used about half way up on the side between the upper and lower hanger-bolts. It was soon found that by placing the strut between the tunnel lining and the crown of the rib, these hanger-bolts could be dispensed with. The lagging was of 3-in. dressed yellow pine, 12 in. wide, and in 15-ft. lengths. Each piece had three saw cuts on the back, from end to end, allowing it to be bent to the curve of the arch; it was kept curved by an iron strap screwed to the back. The arches were put in, either in 15, 30 or 45-ft. lengths, depending on what was ready for concrete and what could be done in one continuous working. The rule was that when an arch was begun, the work must not stop until it was finished. An arch length always ended in the middle of a ring. The lagging was placed to a height of about 6 ft. above the bench before any concreting was done. When the concrete had been brought up to that point, lagging was added, one piece at a time, just ahead of the concrete, up to the crown,
PREV.   NEXT  
|<   67   68   69   70   71   72   73   74   75   76   77   78   >>  



Top keywords:

concrete

 

shutters

 
lagging
 

hanger

 

working

 

lengths

 

curved

 

placing

 

pieces

 
remainder

lining
 

removed

 

tunnel

 
dispensed
 
dressed
 

yellow

 

middle

 
height
 

finished

 
length

brought

 
concreting
 
screwed
 

arches

 

allowing

 

continuous

 
depending
 

additional

 

ladders

 
specifications

required
 

creosote

 

tacked

 

nailed

 

important

 

impaired

 

remaining

 

refuge

 

niches

 
surface

ground
 
mortar
 

exposed

 

spliced

 

radius

 
spaced
 

intervals

 

easily

 

fastened

 

supported