FREE BOOKS

Author's List




PREV.   NEXT  
|<   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37  
38   39   40   >>  
also hinder the rapid movement of the expedition corps. When the transports do not remain in close communication with the troops after landing, a very large supply of stores is necessary to make the army independent of the vessels. There should be added, therefore, a reserve ammunition column to that already provided. A fixed amount of supplies should be determined upon, taking due consideration of the extent of the voyage. The troops could requisition some materials from the hostile country. EMBARKATION. Proper loading is the business of the land forces and should be conducted by trained officers so as to ensure the shipment of materials and men. To make landing effective the necessary supplies should go on the vessels with the troops. A loading plan should be so drawn up in advance as to meet all emergencies. The length of time consumed for loading depends on the distance of the voyage. At the most the limit of a short sea voyage for us has been considered about forty-eight hours. This is too small an estimate; it should undoubtedly be doubled. The Italian General Staff estimates the length of a short sea voyage to be five days. Besides, to preserve the fighting worth of our troops, we must allow sufficient time for rest. The troop transport capacity of a ship has heretofore been calculated by the ship's tonnage, that is, sixty per cent. of the ship's capacity is net ton loading space. The necessary space for us, for a long sea voyage, is set at two tons for each man and six to seven tons for each horse. The English and Russian estimates are about the same. But the English transports to Cape Town accommodated a larger number of troops than was thought possible, and the American transports to Cuba were increased by one-third. As for the arrangements which must be made for sleeping, cooking and washing and for a hospital service, we need not go any further here, as they have been discussed at length in the press. The stowing of equipment and baggage should be done in such a way as to make the articles available on landing in the order in which they are needed. The ship's space required for maintenance supplies for man and horse figures relatively as about one to five. Coming next to the loading of the artillery, the rule should be to place all common and machine guns on deck. A certain amount of ammunition should be stowed so as to be quickly accessible. This is an essential measure to afford the transp
PREV.   NEXT  
|<   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37  
38   39   40   >>  



Top keywords:
troops
 
loading
 

voyage

 

transports

 

length

 

supplies

 

landing

 

English

 

materials

 
amount

estimates
 

vessels

 

ammunition

 

capacity

 

thought

 
tonnage
 

calculated

 

Russian

 
larger
 

accommodated


number

 

washing

 

Coming

 

artillery

 
figures
 

maintenance

 

needed

 

required

 

common

 

essential


accessible
 
measure
 
afford
 

transp

 

quickly

 
stowed
 

machine

 

articles

 

sleeping

 
cooking

heretofore

 
hospital
 

arrangements

 

increased

 

service

 
equipment
 
stowing
 
baggage
 

discussed

 
American