FREE BOOKS

Author's List




PREV.   NEXT  
|<   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51  
52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   >>   >|  
partly due to the personal views of the different sub-contractors. The work was all done by open excavation, the so-called "cut and cover" system, but the conditions varied widely along different parts of the line, and different means were adopted to overcome local difficulties. The distance of the rock surface below the street level had a marked influence on the manner in which the excavation of the open trenches could be made. In some places this rock rose nearly to the pavement, as between 14th and 18th Streets. At other places the subway is located in water-bearing loam and sand, as in the stretch between Pearl and Grand Streets, where it was necessary to employ a special design for the bottom, which is illustrated by drawing on page 42. This part of the route includes the former site of the ancient Collect Pond, familiar in the early history of New York, and the excavation was through made ground, the pond having been filled in for building purposes after it was abandoned for supplying water to the city. The excavations through Canal Street, adjacent, were also through made ground, that street having been at one time, as its name implies, a canal. From the City Hall to 9th Street was sand, presenting no particular difficulties except through the territory just described. At Union Square rock was encountered on the west side of Fourth Avenue from the surface down. On the east side of the street, however, at the surface was sand, which extended 15 feet down to a sloping rock surface. The tendency of the sand to a slide off into the rock excavation required great care. The work was done, however, without interference with the street traffic, which is particularly heavy at that point. [Illustration: DUCTS IN SIDE WALLS--EIGHT ONLY OF THE SIXTEEN LAYERS ARE SHOWN] [Illustration: REINFORCED CONCRETE CONSTRUCTION] [Illustration: ROOF SHOWING CONCRETE-STEEL CONSTRUCTION--LENOX AVENUE AND 140TH-141ST STREETS] [Illustration: SECTION OF SUBWAY AT PEARL STREET This construction was made necessary by encountering a layer of Peat resting on Clay] [Illustration: SURFACE RAILWAY TRACKS SUPPORTED OVER EXCAVATION ON UPPER BROADWAY] [Illustration: SUBDIVISION OF 36" AND 30" GAS MAINS OVER ROOF OF SUBWAY--66TH STREET AND BROADWAY] The natural difficulties of the route were increased by the network of sewers, water and gas mains, steam pipes, pneumatic tubes, electric conduits and their accessories, which fille
PREV.   NEXT  
|<   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51  
52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   >>   >|  



Top keywords:

Illustration

 
street
 
surface
 

excavation

 
difficulties
 
places
 
ground
 

Streets

 

STREET

 

CONCRETE


CONSTRUCTION
 
SUBWAY
 

Street

 
BROADWAY
 
required
 

extended

 
Avenue
 

Fourth

 

Square

 

encountered


sloping

 

interference

 

traffic

 

tendency

 

STREETS

 

natural

 

increased

 
network
 
SUBDIVISION
 

sewers


conduits

 

accessories

 
electric
 

pneumatic

 

EXCAVATION

 

SUPPORTED

 

AVENUE

 

SHOWING

 

LAYERS

 
REINFORCED

SECTION

 

SURFACE

 

RAILWAY

 

TRACKS

 
resting
 

construction

 

encountering

 

SIXTEEN

 

excavations

 

trenches