FREE BOOKS

Author's List




PREV.   NEXT  
|<   192   193   194   195   196   197   198   199   200   201   202   203   204   205   206   207   208   209   210   211   212   213   214   215   216  
217   218   219   220   221   222   223   224   225   226   227   228   229   230   231   232   233   234   235   236   237   238   239   240   241   >>   >|  
ks should be so made as to admit of the tubes being blown through with steam to clear them, as in muddy water they will become so soiled that the water cannot be seen. The gauge cocks frequently have pipes running up within the boiler, to the end that a high water level may be made consistent with an easily accessible position of the gauge cocks themselves. With the glass tubes, however, this species of arrangement is not possible, and the glass tubes must always be placed in the position of the water level. 474. Q.--What is the proper material of the pipes in steam vessels? A.--Most of the pipes of marine engines should be made of copper. The steam pipes may be of cast iron, if made very strong, but the waste water pipes should be of copper. Cast iron blow-off pipes have in some cases been employed, but they are liable to fracture, and are dangerous. The blow-off and feed pipes should be of copper, but the waste steam pipe may be of galvanized iron. Every pipe passing through the ship's side, and every pipe fixed at both ends, and liable to be heated and cooled, should be furnished with a faucet or expansive joint; and in the case of the cast iron pipes, the part of the pipe fitting into the faucet should be turned. In the distribution of the faucets of the pipes exposed to pressure, care must be taken that they be so placed that the parts of the pipe cannot be forced asunder, or turned round by the strain, as serious accidents have occurred from the neglect of this precaution. 475. _Q._--What is the best mode of making pipes tight where they penetrate the ship's side? _A._--In wooden vessels the pipes where they pierce the ship's side, should be made tight, as follows:--the hole being cut, a short piece of lead pipe, with a broad flange at one end, should be fitted into it, the place having been previously smeared with white lead, and the pipe should then be beaten on the inside, until it comes into close contact all around with the wood. A loose flange should next be slipped over the projecting end of the lead pipe, to which it should be soldered, and the flanges should both be nailed to the timber with scupper nails, white lead having been previously spread underneath. This method of procedure, it is clear, prevents the possibility of leakage down through the timbers; and all, therefore, that has to be guarded against after this precaution, is to prevent leakage into the ship. To accomplish this object, let th
PREV.   NEXT  
|<   192   193   194   195   196   197   198   199   200   201   202   203   204   205   206   207   208   209   210   211   212   213   214   215   216  
217   218   219   220   221   222   223   224   225   226   227   228   229   230   231   232   233   234   235   236   237   238   239   240   241   >>   >|  



Top keywords:

copper

 

precaution

 
vessels
 

faucet

 

turned

 
flange
 

liable

 

previously

 

position

 

leakage


prevent

 

fitted

 
neglect
 

guarded

 
making
 
pierce
 
penetrate
 

wooden

 

object

 

accomplish


smeared

 

scupper

 
spread
 

slipped

 

timber

 

flanges

 
projecting
 

nailed

 

underneath

 

contact


beaten

 

possibility

 

soldered

 

inside

 

prevents

 

method

 

procedure

 
timbers
 

arrangement

 

species


accessible

 

engines

 
marine
 
proper
 

material

 

easily

 

soiled

 
boiler
 

consistent

 

frequently