FREE BOOKS

Author's List




PREV.   NEXT  
|<   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43  
44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   67   68   >>   >|  
only be man-handled across it. Meanwhile the construction of a bridge was commenced close to the road bridge at Venizel. At 2 P.M. the Twelfth Infantry Brigade attacked in the direction of Chivres and Vregny with the object of securing the high ground east of Chivres, as a necessary preliminary to a further advance northward. This attack made good progress, but at 5:30 P.M. the enemy's artillery and machine gun fire from the direction of Vregny became so severe that no further advance could be made. The positions reached were held till dark. The pontoon bridge at Venizel was completed at 5:30 P.M., when the Tenth Infantry Brigade crossed the river and moved to Bucy le Long. The Nineteenth Infantry Brigade moved to Billy-sur-Aisne, and before dark all the artillery of the division had crossed the river, with the exception of the heavy battery and one brigade of field artillery. During the night the positions gained by the Twelfth Infantry Brigade to the east of the stream running through Chivres were handed over to the Fifth Division. The section of the bridging train allotted to the Third Corps began to arrive in the neighborhood of Soissons late in the afternoon, when an attempt to throw a heavy pontoon bridge at Soissons had to be abandoned, owing to the fire of the enemy's heavy howitzers. In the evening the enemy retired at all points and intrenched himself on the high ground about two miles north of the river, along which runs the Chemin-des-Dames. Detachments of infantry, however, strongly intrenched in commanding points down slopes of the various spurs, were left in front of all three corps with powerful artillery in support of them. During the night of the 13th and on the 14th and following days the field companies were incessantly at work night and day. Eight pontoon bridges and one foot bridge were thrown across the river under generally very heavy artillery fire, which was incessantly kept up on to most of the crossings after completion. Three of the road bridges, i.e., Venizel, Missy, and Vailly, and the railway bridge east of Vailly, were temporarily repaired so as to take foot traffic, and the Villiers Bridge made fit to carry weights up to six tons. Preparations were also made for the repair of the Missy, Vailly and Bourg bridges so as to take mechanical transport. The weather was very wet and added to the difficulties by cutting up the already indifferent approaches, entailing a large
PREV.   NEXT  
|<   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43  
44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   67   68   >>   >|  



Top keywords:

bridge

 

artillery

 

Brigade

 

Infantry

 

Vailly

 

Chivres

 

pontoon

 

bridges

 

Venizel

 
crossed

positions

 
During
 
intrenched
 

incessantly

 
Soissons
 

points

 

ground

 

Vregny

 
Twelfth
 

advance


direction

 

powerful

 

support

 
Bridge
 
companies
 

indifferent

 

Chemin

 

difficulties

 

commanding

 

slopes


strongly

 
Detachments
 

infantry

 

repaired

 

temporarily

 

repair

 

completion

 

Preparations

 
cutting
 

crossings


Villiers
 
entailing
 

traffic

 

approaches

 

transport

 

railway

 

weather

 
thrown
 

mechanical

 
weights