s: $767 million, including capital expenditures of $300
million (1991 est.)
Exports: $1.01 billion (f.o.b., 1993 est.)
commodities: copper, zinc, cobalt, lead, tobacco
partners: EC countries, Japan, South Africa, US, India
Imports: $1.13 billion (c.i.f., 1993 est.)
commodities: machinery, transportation equipment, foodstuffs, fuels,
manufactures
partners: EC countries, Japan, Saudi Arabia, South Africa, US
External debt: $7.3 billion (1993)
Industrial production: growth rate -1% (1992); accounts for 42% of GDP
Electricity:
capacity: 2,440,000 kW
production: 7.8 billion kWh
consumption per capita: 650 kWh (1993)
Industries: copper mining and processing, construction, foodstuffs,
beverages, chemicals, textiles, and fertilizer
Agriculture: accounts for 12% of GDP and 85% of labor force; crops -
corn (food staple), sorghum, rice, peanuts, sunflower, tobacco,
cotton, sugarcane, cassava; cattle, goats, beef, eggs
Illicit drugs: increasingly a regional transshipment center for
methaqualone and heroin
Economic aid:
recipient: US commitments, including Ex-Im (1970-89), $4.8 billion;
Western (non-US) countries, ODA and OOF bilateral commitments
(1970-89), $4.8 billion; OPEC bilateral aid (1979-89), $60 million;
Communist countries (1970-89), $533 million
Currency: 1 Zambian kwacha (ZK) = 100 ngwee
Exchange rates: Zambian kwacha (ZK) per US$1 - 672.8 (September 1994),
434.78 (1993), 156.25 (1992), 61.7284 (1991), 28.9855 (1990)
Fiscal year: calendar year
@Zambia:Transportation
Railroads:
total: 1,273 km
narrow gauge: 1,273 km 1.067-m gauge (13 km double track)
note: not a part of Zambia Railways is the Tanzania-Zambia Railway
Authority (TAZARA), which operates 1,860 km of 1.067-m narrow gauge
track between Dar es Salaam and New Kapiri M'poshi where it connects
to the Zambia Railways system; 891 km of the TAZARA line transit
Zambia
Highways:
total: 36,370 km
paved: 6,500 km
unpaved: crushed stone, gravel, stabilized earth 7,000 km; improved,
unimproved earth 22,870 km
Inland waterways: 2,250 km, including Zambezi and Luapula Rivers, Lake
Tanganyika
Pipelines: crude oil 1,724 km
Ports: Mpulungu
Airports:
total: 113
with paved runways over 3,047 m: 1
with paved runways 2,438 to 3,047 m: 4
with paved runways 1,524 to 2,437 m: 4
with paved runways 914 to 1,523 m: 4
with paved runways under 914 m: 39
with unpaved runways 1,524
|