FREE BOOKS

Author's List




PREV.   NEXT  
|<   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31  
32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   >>  
single flush-deck letter-of-marque, renamed _Yorktown_; and they had a contract to build the sloop-of-war _Peacock_. It is remarkable that the Browns could undertake and complete so much work between 1813 and 1815 and still be able to build the steam battery in a very short time. With the contracts in order, the Browns began building. The keels of the battery were laid June 20, 1814. It is apparent that the Browns prepared the original hull plans, undoubtedly before the building authority was obtained. The vessel required only about four months to build; she was launched October 29, 1814, at 9 a.m. This was an excellent performance, considering the size of the vessel, the amount of timber required and handled in her massive construction, and the other work being done by the builders. During the ship's construction, sightseers were a nuisance and finally guards had to be obtained. During the building of the steam battery, work had to be practically stopped on the sloop-of-war _Peacock_ at one period after she had been partially planked. There were difficulties in obtaining metalwork for the vessel during her construction, due to the blockade and the demand for such material for other shipbuilding at New York. On November 21, 1814, the ship was towed from the Browns' yard on the East River by Fulton's _Car of Neptune_ and _Fulton_, each lashed to the sides of the battery, and taken to Fulton's works on the North River. There Fulton supervised in person the completion of the vessel and construction of her machinery. Undoubtedly only a little of his time was required in inspection of the Browns' work on the battery, for the shipbuilders had been closely associated with Fulton throughout the life of the project and were fully capable as ship designers. The work on the machinery was another matter, however, for men capable of working metal were scarce and few workmen could read plans. Fulton had some of the work done outside of his own plant, particularly the brass and copper work (mostly by John Youle's foundry). As a result, Fulton was required to move from plant to plant, keeping each job under almost constant observation and personally supervising the workmen. The equipment then available for building a large engine was inadequate in many ways. The large steam cylinder presented a problem: it had to be recast several times and some of the other parts gave trouble, either in casting or in machining and fitting. [Illu
PREV.   NEXT  
|<   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31  
32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   >>  



Top keywords:

Fulton

 
battery
 

Browns

 
vessel
 

building

 

required

 

construction

 

machinery

 

capable

 

workmen


During

 

obtained

 
Peacock
 

closely

 

project

 

designers

 
shipbuilders
 

inspection

 
lashed
 

machining


Neptune
 

fitting

 

supervised

 

matter

 

casting

 

Undoubtedly

 

person

 

completion

 

trouble

 

result


foundry

 

engine

 

inadequate

 
keeping
 
personally
 

equipment

 

observation

 
constant
 

recast

 

scarce


working

 

copper

 

cylinder

 

problem

 

presented

 
supervising
 

apparent

 
contracts
 

prepared

 

original