be addressed and implemented
prior to E911 cutover. These functions can be best addressed by the
formation of a sub-committee of the E911 Implementation Team to set up
guidelines for and to secure service commitments of interfacing
organizations. A SSC/MAC supervisor should chair this subcommittee and
include the following organizations:
1) Switching Control Center
- E911 translations
- Trunking
- End office and Tandem office hardware/software
2) Recent Change Memory Administration Center
- Daily RC update activity for TN/ESN translations
- Processes validity errors and rejects
3) Line and Number Administration
- Verification of TN/ESN translations
4) Special Service Center/Major Account Center
- Single point of contact for all PSAP and Node to host troubles
- Logs, tracks & statusing of all trouble reports
- Trouble referral, follow up, and escalation
- Customer notification of status and restoration
- Analyzation of "chronic" troubles
- Testing, installation and maintenance of E911 circuits
5) Installation and Maintenance (SSIM/I&M)
- Repair and maintenance of PSAP equipment and Telco owned sets
6) Minicomputer Maintenance Operations Center
- E911 circuit maintenance (where applicable)
7) Area Maintenance Engineer
- Technical assistance on voice (CO-PSAP) network related E911 troubles
Maintenance Guidelines
~~~~~~~~~~~~~~~~~~~~~
The CCNC will test the Node circuit from the 202T at the Host site to
the 202T at the Node site. Since Host to Node (CCNC to MMOC) circuits
are official company services, the CCNC will refer all Node circuit
troubles to the SSC/MAC. The SSC/MAC is responsible for the testing and
follow up to restoration of these circuit troubles.
Although Node to PSAP circuit are official services, the MMOC will
refer PSAP circuit troubles to the appropriate SSC/MAC. The SSC/MAC is
responsible for testing and follow up to restoration of PSAP circuit
troubles.
The SSC/MAC will also receive reports from CRSAB/IMC(s) on subscriber
911 troubles when they are not line troubles. The SSC/MAC is
responsible for testing and restoration of these troubles.
Maintenance responsibilities are as follows:
SCC@ Voice Network (ANI to PSAP)
@SCC responsible for tandem switch
SSIM/I&M PSAP Equipment (Modems, CIU's, sets)
Vendor PSAP Equipment (when CPE)
SSC/MAC PSAP to Node circuits, and tan
|