on, while the third consisted of sedimentation and coagulation. The sedimentation tank was of sufficient size, when compared with the area of the experimental slow sand filter, to represent the Georgetown and McMillan Park Reservoirs when used in connection with the large filters. The first preliminary filter was very similar in construction and operation to a mechanical filter. The sand for this filter was taken from the main filters, and, consequently, was finer than is generally used in mechanical filters. The second preliminary filter was a Maignen scrubber. It consisted of a cylindrical concrete tank, 4 ft. in diameter and 8-1/2 ft. deep, which contained 12 in. of cobble-stones on the bottom, then, successively, 12 in. of egg-size coke, 12 in. of stove-size coke, 24 in. of nut-size coke, and 24 in. of sponge clippings as the final or top layer. ~Table 14--Cost Per Million Gallons Filtered.~ (_A_) ~Labor~. =============+===========+==========+================== | Office | | ~Filter~ | and | Pumping | ~operations~: Month. |laboratory.| station. +------------------ | | | Sand |Repairs | | |handling.| etc. -------------+-----------+----------+---------+-------- 1909. -------------+-----------+----------+---------+-------- July | $0.73 | $0.57 | $0.86 | ... August | 0.75 | 0.64 | 0.59 | ... September | 0.83 | 0.67 | 0.80 | ... October | 0.72 | 0.66 | 0.73 | ... November | 0.87 | 0.76 | 0.42 | ... December | 0.90 | 0.69 | 0.27 | ... -------------+-----------+----------+---------+-------- 1910. -------------+-----------+----------+---------+-------- January | 0.81 | 0.63 | 0.33 | ... February | 0.94 | 0.74 | 0.35 | $0.07 March | 0.92 | 0.81 | 0.30 | 0.07 April | 0.93 | 0.83 | 0.49 | 0.03 May | 0.86 | 0.72 | 0.36 | 0.03 June | 0.88 | 0.67 | 0.38 | ... -------------+-----------+----------+---------+-------- Average | 0.84 | 0.70 | 0.27 |[1]0.25 -------------+-----------+----------+---------+-------- Fiscal years: -------------+-----------+----------+---------+---
PREV.   NEXT  
|<   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56  
57   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   >>   >|  



Top keywords:

filter

 
filters
 
mechanical
 

preliminary

 

sedimentation

 

consisted

 

August

 

October

 
September
 

operations


Pumping

 

Filter

 

Office

 

laboratory

 

station

 

handling

 

Repairs

 

Fiscal

 

Average

 

December


November
 

January

 
February
 

sponge

 

operation

 

construction

 

similar

 

generally

 

compared

 

sufficient


coagulation

 

experimental

 

Reservoirs

 
connection
 

McMillan

 

represent

 

Georgetown

 
Maignen
 

scrubber

 

clippings


Million

 

Gallons

 

successively

 

diameter

 

concrete

 

cylindrical

 

bottom

 

stones

 

cobble

 

contained