FREE BOOKS

Author's List




PREV.   NEXT  
|<   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100   101   102   103   104  
105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124   125   126   127   128   129   >>   >|  
ing the difficulty of this process in such peculiar circumstances, not a single stone was lost, or even seriously damaged, during the whole course of the erection of the tower, which occupied four years in building, or rather, we should say, four _seasons_, for no work was or could be done during winter. A description of the first entire course of the lower part of the tower, which was built solid, will be sufficient to give an idea of the general nature of the whole work. This course or layer consisted of 123 blocks of stone, those in the interior being sandstone, while the outer casing was of granite. Each stone was fastened to its neighbour above, below, and around by means of dovetails, joggles, oaken trenails, and mortar. Each course was thus built from its centre to its circumference, and as all the courses from the foundation to a height of thirty feet were built in this way, the tower, up to that height, became a mass of solid stone, as strong and immovable as the Bell Rock itself. Above this, or thirty feet from the foundation, the entrance-door was placed, and the hollow part of the tower began. Thus much, then, as to the tower itself, the upper part of which will be found described in a future chapter. In regard to the subsidiary works, the erection of the beacon house was in itself a work of considerable difficulty, requiring no common effort of engineering skill. The principal beams of this having been towed to the rock by the _Smeaton_, all the stanchions and other material for setting them up were landed, and the workmen set about erecting them as quickly as possible, for if a single day of bad weather should occur before the necessary fixtures could be made, the whole apparatus would be infallibly swept away. The operation being, perhaps, the most important of the season, and one requiring to be done with the utmost expedition, all hands were, on the day in which its erection was begun, gathered on the rock, besides ten additional men engaged for the purpose, and as many of the seamen from the _Pharos_ and other vessels as could be spared. They amounted altogether to fifty-two in number. About half-past eight o'clock in the morning a derrick, or mast, thirty feet high, was erected, and properly supported with guy-ropes for suspending the block for raising the first principal beam of the beacon, and a winch-machine was bolted down to the rock for working the purchase-tackle. The necessar
PREV.   NEXT  
|<   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100   101   102   103   104  
105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124   125   126   127   128   129   >>   >|  



Top keywords:

erection

 

thirty

 
foundation
 

height

 

requiring

 

single

 

principal

 

difficulty

 

beacon

 

operation


important
 

infallibly

 

season

 

erecting

 

landed

 

workmen

 

setting

 

material

 

Smeaton

 

stanchions


quickly

 

fixtures

 

apparatus

 

weather

 

Pharos

 

properly

 

erected

 

supported

 

morning

 
derrick

suspending

 
working
 

purchase

 

tackle

 

necessar

 

bolted

 

raising

 

machine

 

additional

 

engaged


purpose

 

expedition

 

gathered

 

seamen

 

number

 

altogether

 

vessels

 
spared
 

amounted

 

utmost