FREE BOOKS

Author's List




PREV.   NEXT  
|<   214   215   216   217   218   219   220   221   222   223   224   225   226   227   228   229   230   231   232   233   234   235   236   237   238  
239   240   241   242   243   244   245   246   247   248   249   250   251   252   253   254   255   256   257   258   259   260   261   262   263   >>   >|  
he waves. The model either rode over them or passed through them; if it was sometimes rolled over, it righted itself at once, and resumed its proper attitude in the waters. After a considerable trial I found scarcely a trace of water inside. Such as had got there was merely through the joints in the sliding hatches; though the ventilators were free to work during the experiments. I completed the prescribed drawings and specifications, and sent them, together with the model, to Somerset House. Some 280 schemes of lifeboats were submitted for competition; but mine was not successful. I suspect that the extreme novelty of the arrangement deterred the adjudicators from awarding in its favour. Indeed, the scheme was so unprecedented, and so entirely out of the ordinary course of things, that there was no special mention made of it in the report afterwards published, and even the description there given was incorrect. The prize was awarded to Mr. James Beeching, of Great Yarmouth, whose plans were afterwards generally adopted by the Lifeboat Society. I have preserved my model just as it was; and some of its features have since been introduced with advantage into shipbuilding.[1] The firm of Robert Stephenson and Co. having contracted to build for the Government three large iron caissons for the Keyham Docks, and as these were very similar in construction to that of an ordinary iron ship, draughtsmen conversant with that class of work were specially engaged to superintend it. The manager, knowing my fondness for ships, placed me as his assistant at this new work. After I had mastered it, I endeavoured to introduce improvements, having observed certain defects in laying down the lines--I mean by the use of graduated curves cut out of thin wood. In lieu of this method, I contrived thin tapered laths of lancewood, and weights of a particular form, with steel claws and knife edges attached, so as to hold the lath tightly down to the paper, yet capable of being readily adjusted, so as to produce any form of curve, along which the pen could freely and continuously travel. This method proved very efficient, and it has since come into general use. The Messrs. Stephenson were then also making marine engines, as well as large condensing pumping engines, and a large tubular bridge to be erected over the river Don. The splendid high-level bridge over the Tyne, of which Robert Stephenson was the engineer, was also in course
PREV.   NEXT  
|<   214   215   216   217   218   219   220   221   222   223   224   225   226   227   228   229   230   231   232   233   234   235   236   237   238  
239   240   241   242   243   244   245   246   247   248   249   250   251   252   253   254   255   256   257   258   259   260   261   262   263   >>   >|  



Top keywords:
Stephenson
 

ordinary

 

method

 

engines

 

Robert

 

bridge

 

similar

 
curves
 

defects

 
laying

observed

 

graduated

 

Keyham

 

caissons

 

endeavoured

 
manager
 

knowing

 
fondness
 

superintend

 

engaged


conversant

 
draughtsmen
 

mastered

 

specially

 

introduce

 

construction

 

assistant

 
improvements
 

general

 

Messrs


making
 

efficient

 
continuously
 

freely

 

travel

 

proved

 

marine

 

splendid

 

engineer

 

pumping


condensing

 

tubular

 

erected

 
attached
 
weights
 

lancewood

 
contrived
 

tapered

 

produce

 

adjusted