FREE BOOKS

Author's List




PREV.   NEXT  
|<   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37  
38   >>  
whether directly or under a mortgage, to assume the obligations already assumed by the Railroad Company and the Railroad Company not to be relieved of such obligations by the grant. This franchise was passed by the Board of Aldermen on December 16th and approved by the Mayor on December 23d, 1902. Subsequently, an agreement, dated June 21st, 1907, was entered into by the City of New York, the Tunnel Company, and the Long Island Railroad Company covering the construction of the Sunnyside Yard, which forms the eastern terminus of the line. In pursuance of this agreement, the map or plan of the City of New York was changed by discontinuing or closing portions of fifty streets or avenues, and by changing the grades of sixteen streets or avenues, in the Borough of Queens, and the portions of streets and avenues thus discontinued and closed, most of which were not opened for public use, were sold to the Railroad Companies. The agreement, however, reserved to the City permanent and perpetual underground rights and easements to maintain in a reasonable manner, not inconsistent with the construction and operation of the railroad facilities of the Companies, its existing sewers, drains, and other sub-surface structures in, under, and through the lands within the lines of the discontinued portions of each of such streets and avenues, including the right to repair, rebuild, and enlarge the same, and to construct in a reasonable manner, not inconsistent with the construction and operation of the railroad facilities of the Companies, such additional sewers or drains in, under, or through the lands as may be hereafter required by the City, together with the right to enter upon the premises from time to time as may be necessary for the purpose of inspecting, repairing, constructing, or rebuilding the sub-surface structures. The agreement required the Companies to construct at their expense, four viaducts or bridges over their tracks and terminal development, three with roadways 42 ft. wide, one with a roadway 60 ft. wide, and each to have two sidewalks 10 ft. wide, the work to include the paving of the roadways and sidewalks. The Companies are further required to pay one-half the cost of the construction of the foundations, abutments, piers, superstructures, and approach of an additional viaduct or bridge over the Sunnyside Yard, to have a roadway not more than 60 ft. wide and two sidewalks each 10 ft. wide, and to grant the
PREV.   NEXT  
|<   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37  
38   >>  



Top keywords:

Companies

 
construction
 

agreement

 
streets
 

avenues

 

Company

 
Railroad
 

portions

 

sidewalks

 

required


sewers

 
facilities
 

drains

 

surface

 

structures

 

operation

 

inconsistent

 
discontinued
 

reasonable

 

manner


obligations

 

roadway

 

roadways

 

additional

 

construct

 
railroad
 
December
 

Sunnyside

 
rebuilding
 

expense


bridges
 

viaducts

 

constructing

 

Subsequently

 
purpose
 

mortgage

 

franchise

 

inspecting

 
premises
 

repairing


terminal

 
foundations
 

abutments

 

bridge

 

viaduct

 
superstructures
 

approach

 
paving
 

include

 

development