FREE BOOKS

Author's List




PREV.   NEXT  
|<   80   81   82   83   84   85   86   87   88   89   >>  
pipe line several miles long and fed from a spring. The amount of water varied considerably and was at times quite insufficient for the load on the plant. Instead of meeting this condition with the best apparatus possible, a chain of difficulties were added to it, with the results given. INDEX Acceleration, rate of, 147 Adjustment, axial, 65 making, 66 Air-pump, examining, 163 Allis-Chalmers Co. steam turbine, 41 Auxiliaries, 2, 154 special, 165 Auxiliary plant for consumption test, 137 spring on governor dome, 28 Axial adjustment, 65 Baffler, 36 functions, 39 Bearings, main, 69 Blades, construction details, 44 inspecting, 104 Blading, Allis-Chalmers turbine, 48 Westinghouse-Parsons turbine, 59, 92 Blueprints, studying, 11 Buckets, moving, 14 stationary, 14 Bushings, 36 Carbon packing, 19 ring, 20 Central gravity oiling system, 111 Circulating pump fails to meet guarantee, 172 Clearance, 15, 150 adjusting, 18 between moving and stationary buckets, 4 gages, 17 measuring, 18 radial, 63 Comma lashing, 95 Condensers, 108, 131 jet, 154 Conditions for successful operation, 105 Cooling water supply limited, 177 Coupling, 127 Cover-plate, 4 -plate, lowering, 9 Curtis turbine, 11 turbine in practice, 1 setting valves, 31, 32 De Laval turbines, 118 Draining system, 105 Dummy leakage, 115 pistons, 63, 65 rings, 43, 113, 114 Equalizing pipes, 64 Exhaust end of turbine, 107 pipe, 107 Expanding nozzles, 14 Feed-pipes, 164 Flow, rate, 38 Foundation drawings, 2 rings, 44, 46 Fourth-stage wheel, 14 Franklin, Thomas, 112, 137, 154 Gages, calibrating and adjusting, 169 clearance, 17 for test work, 165 Generator, 53 Glands, examination for scale, 104 packing, 71, 77 regulation, 148 Governor, Allis-Chalmers turbine, 48 Curtis turbine, 27, 31 improved, Westinghouse-Parsons turbine, 83 -rods, adjusting, 35 safety-stop, 86 Westinghouse-Parsons turbine, 80 Grinding, 38 Guide-bearing, lower, 9 Gump, Walter B., 172 Holly draining system, 106 Horseshoe shim, 8 Hot-well regulation, 148 Inspection, 103 Intermediate, 14 Jacking ring, 8 Jet condenser, 154 Johnson, Fred L., 1, 31 Leakage, 118 Load variation, 144 Lower guide-bearing, 9 Lubrication, 51 Measuring tanks, 171 Mechanical valve-gear, 3
PREV.   NEXT  
|<   80   81   82   83   84   85   86   87   88   89   >>  



Top keywords:

turbine

 

adjusting

 
Parsons
 

Westinghouse

 

Chalmers

 

system

 

moving

 
bearing
 

Curtis

 

stationary


packing

 

regulation

 

spring

 
Franklin
 
Thomas
 

Fourth

 

Foundation

 
drawings
 

calibrating

 

examination


Glands
 

clearance

 
Generator
 

Draining

 

leakage

 

pistons

 

turbines

 

making

 

Expanding

 
nozzles

Exhaust

 

Equalizing

 

Governor

 
Leakage
 

variation

 
Johnson
 
condenser
 

Intermediate

 

Jacking

 
Mechanical

Lubrication

 
Measuring
 
Inspection
 

Grinding

 

safety

 

improved

 

Horseshoe

 
Adjustment
 
draining
 

Walter