FREE BOOKS

Author's List




PREV.   NEXT  
|<   100   101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124  
125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140   141   142   143   144   145   146   147   148   149   >>   >|  
Swedes in the course of the war. The works were immediately commenced on a vast scale, and they were carried on during the summer with great energy. The first thing to be secured was, of course, the construction of the fortress which was to defend the town. There were wharves and piers to be built too, in order that the vessels bringing stores and provisions might land their goods. The land was surveyed, streets laid out, building lots assigned to merchants for warehouses and shops, and to the boyars for palaces and gardens. The boyars commenced the building of their houses, and the Czar himself laid the foundation of an imperial palace. But, notwithstanding all the precautions which Peter had taken to secure supplies of every thing required for such an undertaking, and to regulate the work by systematic plans and arrangements, the operations were for a time attended with a great deal of disorder and confusion, and a vast amount of personal suffering. For a long time there was no proper shelter for the laborers. Men came to the ground much faster than huts could be built to cover them, and they were obliged to lie on the marshy ground without any protection from the weather. There was also a great scarcity of tools and implements suitable for the work that was required, in felling and transporting trees, and in excavating and filling up, where changes in the surface were required. In constructing the fortifications, for example, which, in the first instance, were made of earth, it was necessary to dig deep ditches and to raise great embankments. There was a great deal of the same kind of work necessary on the ground where the city was to stand before the work of erecting buildings could be commenced. There were dikes and levees to be made along the margin of the stream to protect the land from the inundations to which it was subject when the river was swollen with rains. There were roads to be made, and forests to be cleared away, and many other such labors to be performed. Now, in order to employ at once the vast concourse of laborers that were assembled on the ground in such works as these, an immense number of implements were required, such as pickaxes, spades, shovels, and wheelbarrows; but so limited was the supply of these conveniences, that a great portion of the earth which was required for the dikes and embankments was brought by the men in their aprons, or in the skirts of their clothes, or in bag
PREV.   NEXT  
|<   100   101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124  
125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140   141   142   143   144   145   146   147   148   149   >>   >|  



Top keywords:
required
 

ground

 

commenced

 
building
 

implements

 

laborers

 
embankments
 

boyars

 

brought

 
aprons

instance

 

portion

 

ditches

 
felling
 
transporting
 

suitable

 

scarcity

 

excavating

 
filling
 

skirts


conveniences

 

constructing

 

surface

 

clothes

 

fortifications

 

labors

 

shovels

 

forests

 

cleared

 

performed


assembled

 

pickaxes

 
number
 

concourse

 

employ

 
spades
 

levees

 

buildings

 

immense

 

erecting


limited

 

margin

 
stream
 

swollen

 

wheelbarrows

 
subject
 

protect

 
inundations
 
supply
 
assigned