FREE BOOKS

Author's List




PREV.   NEXT  
|<   3   4   5   6   7   8   9   10   11   12   13   14   15   >>  
| | AND BY DOING SO THE JACKET WILL BE DAMAGED | | | +----------------------------------------------+ _LEVELING UNIT_ In case floor is uneven, unit may easily be made level by inserting shims under the 4 shipping lugs. These lugs also keep the jacket 1/2" off the floor, protecting it from wet floors and dampness. _PIPING AND WIRING_ Once the unit is in its proper location with the packing carton, skids and packing material removed, it is ready for piping and connection from Room Thermostat and 110 V. 60 Cy. A.C. Current. _CONTROL SYSTEM_ The controls furnished are for a one zone Forced Water System consisting of T87F Room Thermostat, L8124A-1007 Triple Acting Aquastat and Circulator Relay, C554A-1018 Cadmium Photocell, R8184G-1005 Burner Relay and V4046A-1009 Oil Valve. Description and complete wiring diagram will be found packed with each control. _SPECIAL CONTROL SYSTEMS_ For special control systems such as multiple installations, zone controlled, unit heater, radiant panel, etc., write to factory for wiring diagrams. _CHIMNEY AND BREECHING REQUIREMENTS_ The CP boiler should be connected to a vertical vent system that will prevent: (1) positive pressure in the flue, (2) backward flow of flue gas through the unit when the burner stops, and (3) condensation in the flue. Use double-walled or insulated pipe for sections of the flue in cold areas. All outside vents, except for short extensions, must be insulated to avoid condensation in the flue. Several types of prefabricated chimneys are available providing double-walled or insulated pipe, some with ceramic and others with metallic liners. While the unit is equipped with an induced draft fan, proper size vent must be provided to remove the gases of combustion. It is recommended that a 4" to 5" increaser be used for venting the 87CPO and 108CPO and a 4" to 6" increaser be used for the 128CPO. For abnormal runs (exceeding 10 ft.), consult factory. Vent and breeching must be gas tight by sealing with asbestos or thermo-setting pressure sensitive tape. _DRAFT REGULATOR_ It is recommended that a draft regulator be installed in chimney flue _just below the flue pipe opening_, if the unit is attached to an extremely high chimney; an unlined chimney; or a chimney which is constructed on the exterior of the house. _CONTROLS AND TRIM_ Controls are inst
PREV.   NEXT  
|<   3   4   5   6   7   8   9   10   11   12   13   14   15   >>  



Top keywords:

chimney

 
insulated
 

packing

 
proper
 

Thermostat

 

increaser

 

CONTROL

 

wiring

 

condensation

 

factory


pressure

 

double

 
walled
 

control

 

recommended

 

opening

 
extremely
 

attached

 
sections
 

Several


extensions
 

CONTROLS

 

exterior

 

positive

 

prevent

 

system

 

Controls

 

backward

 

constructed

 

prefabricated


burner

 

unlined

 

providing

 
asbestos
 
venting
 

108CPO

 

thermo

 
combustion
 

vertical

 

128CPO


breeching

 

exceeding

 

abnormal

 

sealing

 

setting

 
remove
 

metallic

 
liners
 

installed

 

ceramic