l heating pipes shall be removed and temporarily capped off below the first floor. All electrical wiring shall be removed and recapped below the first floor level except such as shall be needed for power tools, etc. Contractor shall carefully remove all existing monuments and plaques within building, securely store them, and reset them upon completion at direction of architect. _MATERIALS_--All new joists and studs shall be of construction grade fir, free of all parasites & decay, having a moisture content no greater than 18%. All new subfloor to be 5/8" plyscord. Apply sisalcraft paper between subfloor and finished floor. All flooring shall be 25/32" x 5-1/2" tongue and groove clear southern long leaf yellow pine, with relieved back & face edges slightly eased. The use of resawn used mill framing obtained from demolition companies is recommended in order to obtain straight grain. Architect must be submitted samples of flooring for his approval before use. No pieces shorter than eight feet will be used, except where necessary at juncture of floor & wall. All stair treads shall be of 1' 8" thick clear yellow pine, bull-nosed. All interior woodwork to be of clear western white pine, S 4 S, of thickness as shown on plans. Wainscot shall be of 3/4' thick by 3-5/8", 5-1/2" & 7-1/2" clear white pine, tongue & grooved, with a 1/4" bead on one face edge. Doors, windows (sash & jamb) & balusters will be of clear western white pine. Front door jamb shall be of 1-5/8 th. clear yellow pine. Interior jambs of 1-1/8" th. Cl. yellow pine. Pew material to be of 1-1/8" clear yellow pine, S 4 S. Rails to be birch for staining. Moisture content for all to be no greater than 12%. _FOUNDATION WORK_--Point up all existing foundations, piers, footings, etc. in basement and crawl space. Replace all supporting beams rotted or otherwise unsuitable for re-use. Excavate existing crawl space to a minimum of three feet below joists, and cover with 2-1/2-3" thick broom finished concrete slab, on 4 mil polyethylene film. Move existing basement stair to location on plan, and floor-over opening thus made to top of stairs. _MASONRY_--Carefully remove several sample face bricks from existing sidewalls, clean all but weather-face, and submit to Locher Brick Co., Glasgow, Va. for duplication. Remove segmental arches above two storey window openings, and extend window openings to same height as those of porch chamber w
PREV.   NEXT  
|<   92   93   94   95   96   97   98   99   100   101   102   103   104   105   >>  



Top keywords:

yellow

 
existing
 
content
 

finished

 
tongue
 
joists
 
subfloor
 

flooring

 

basement

 

remove


western
 
window
 

openings

 
removed
 
greater
 

Replace

 
supporting
 

footings

 

foundations

 

windows


balusters

 

grooved

 

Interior

 

Moisture

 

staining

 

FOUNDATION

 

rotted

 
material
 
polyethylene
 

Glasgow


duplication

 

Locher

 
submit
 

sidewalls

 

weather

 

Remove

 

segmental

 

height

 

chamber

 
extend

arches

 

storey

 

bricks

 

sample

 
concrete
 

minimum

 

unsuitable

 

Excavate

 

stairs

 

MASONRY